Topic 1
  • Explain Production Transaction Review and Product Genealogy
  • Configure Resources, Operations, and Work Centers
Topic 2
  • Describe Production Execution transactions (including Outside Processing)
  • Set up common Configuration Elements
Topic 3
  • Explain Common Projects Enabled SCM Configurations
  • Describe Functional Set Up Manager and Simplified Setup
Topic 4
  • Describe Manufacturing Supervisor Mobile Applications
  • Describe Import Production Transactions
Topic 5
  • Explain Cost Reporting, including WIP Inventory Valuation Report
  • Set up Plant Parameters and Security, Profile Options, Lookups and DFFs
Topic 6
  • Evaluate a Work Order completion cost, including Partial and Scrap
  • Explain Work Order Reservations and History
Topic 7
  • Execute Basic Transaction and Work Order Reporting
  • Explain Work Execution Work Areas
Topic 8
  • Transfer Production Transactions to Costing
  • Manage Production Calendars and add Shift and Work Center Resource exceptions

 

NEW QUESTION 23
A production Supervisor has noticed that Work Orders created manually are overwritten by the plan runs executed by Planning Central. After discussing this issue with the Planner, two actions are recommended to prevent the Work Orders from being overwritten by plan runs.
Identify the two recommendations.

  • A. Update Firm flag in the Details region of the Edit Work Definition page.
  • B. Update Firm flag in the Details region of the Edit Work Definition Names page.
  • C. Update Firm flag in the Details region of the Edit Work Order page.
  • D. Update Supply Plan Options, Overwrite Firm Planned Orders = None.

Answer: C,D

 

NEW QUESTION 24
Identify three entities that must be set up in Oracle Manufacturing Cloud to create a Work Definition for an item that will be manufactured in-house.

  • A. Operation Items
  • B. Resources
  • C. Production Line
  • D. Operations
  • E. Manufacturing Lead Time

Answer: A,B,D

 

NEW QUESTION 25
Identify two reports that provide work ordercost-related information to the costing user.

  • A. Purchase Variance Summary
  • B. Work order Operational Analysis
  • C. WIP Balance by Plant
  • D. Cost Accounting Dashboard

Answer: B,D

 

NEW QUESTION 26
Identify three requirements fulfilled by nonstandard work orders.

  • A. Rescheduling
  • B. Prototype
  • C. Repair
  • D. Rework

Answer: B,C,D

 

NEW QUESTION 27
TheManufacturing plant has two 8-hour shifts for the work center WC1: Day Shift and Night Shift. You associate four units each for resources R1, R2, R3, and R4 to the work center WC1. The customer wants to assign all units of resource R2 available for Day andNight Shift.
Identify the correct sequence of steps to achieve this requirement.

  • A. Associate Resource R2 with Work Center WC1> Select Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
  • B. Associate Resource R2 with Work Center WC1> Select the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column > Enter 2 in Night Shift Column.
  • C. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 4 in Day Shift Column> Enter 4 in Night Shift Column.
  • D. Associate Resource R2 with Work Center WC1> Deselect the Available 24 Hours check box> Resource Availability region> Enter 2 in Day Shift Column> Enter 2 in Night Shift Column

Answer: B

 

NEW QUESTION 28
Identify the three changes that are allowed to be made to active Work Definition in a Work Center, without creating a new version.

  • A. Costing Priority
  • B. Production Priority
  • C. Completion Subinventory
  • D. Delete an Operation
  • E. Add an Operation

Answer: B,C,E

 

NEW QUESTION 29
You want to use a predefined Standard Operation in a Work Definition, but you also want to change the usage of the Standard Operation resource. Identify the setup required.

  • A. Deselect the Referenced check box while adding the standard operation to the work definition and change the usage manually.
  • B. Use the Transfer and Edit Standard Operation functionality to edit the resource usage.
  • C. Select the Referenced check box while adding the standard operation to the work definition and change the usage manually.
  • D. Use a Resource exception for the resource and alter its usage.

Answer: C

 

NEW QUESTION 30
You have been asked to set up cost estimates for 10 different purchased items. Which two steps could be used to accomplish this task?

  • A. Run the ESS process "Update Item Cost Estimate".
  • B. Use the Mass Edit functionality.
  • C. Call web service.
  • D. Enter cost estimates directly into UI.
  • E. Import spreadsheet.

Answer: D,E

 

NEW QUESTION 31
A plant operates three continuous daily shifts of eight hours each for five days in a week. One unit of the resource R1 within the plant is assigned for two shifts to work area W1. On a particular day in a given week, due to unscheduled maintenance thatneeded to be performed on the resource R1, it was not available for two hours during each of the assigned shifts.
Determine the available capacity of the resource R1 for thatweek.

  • A. 70 hours
  • B. 60 hours
  • C. 76 hours
  • D. 78 hours

Answer: D

 

NEW QUESTION 32
A Work Center created a month ago is no longer in use now. You want to remove theWork Center; however, the system is no allowing you to delete it.
Identify three reasons for this.

  • A. The Work Center is being referenced in the Open Work Order.
  • B. The work center is being referenced in the Work Area.
  • C. The Work Center is being referenced in the Closed Work Order.
  • D. The work center is being references in the work definition operation.
  • E. There are resources associated with the Work Center.

Answer: A,B,E

 

NEW QUESTION 33
You arereviewing the production status of your manufacturing plant shop floor as a production supervisor.
Your production manager wants a report on a work order statuswhich is reserved against a particular customer.
The final assembly of the work order is serialized.
Which option shows the steps to complete the task using the mobile application?

  • A. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page> Select required work orders> Click Social icon (OSN) > Select recipient, and click Share.
  • B. Search the work order by customer name to open the work order details page> Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, andclick Send.
  • C. Select the infotile Customer to open the work order details page> Click Actions and select the E-mail icon> Select required work orders>Select the e-mail client, enter the recipient's e-mail, and click Send.
  • D. Use your mobile camera to scan the bar coded serial number of the final assembly> Upload the barcode to open the work order details page > Click Actions and select the E-mail icon> Select required work orders> Select the e-mail client, enter the recipient's e-mail, and click Send.

Answer: D

 

NEW QUESTION 34
A Production Operator needs to load Work Order Transactions from an external system into Manufacturing Cloud.
Identify the correct sequence of tasks to be performed.

  • A. Load Data to Fusion repository> Export File to UCM server > Load file from UCM to Interface table
    >Process Import Operations Transactions.
  • B. LoadData to Fusion repository> Export File to UCM server > Process Import Operations Transactions> Load file from UCM to Interface table.
  • C. Load Data to Fusion repository> Load File from UCM to Interface table> Export File to UCM server> Process Import Operations Transactions.
  • D. Export File to UCM server> Load Data to Fusion repository> Process Import Operations Transactions> Load file from UCM to Interface table.

Answer: D

 

NEW QUESTION 35
A production Operator is executing work order in your plant. After completing move transactions, he notices that he has performed some incorrect move operations, including incorrect scrap and reject transactions. He is required to perform a reverse transaction to correct the errors. The operations are not count point enabled and not auto charged.
Identify the four transactions to correct this situation.

  • A. Reverse material issued to a work order.
  • B. Reverse at an operation.
  • C. Reverse from reject to ready.
  • D. Reverse from scrap to ready.
  • E. Reverse resources charged to a work order.
  • F. Reverse the product at the last operation.

Answer: A,C,D,E

 

NEW QUESTION 36
A manufacturing cloud user wants to print information available in the work order in PDF.
Identify the three reports that the user can print directly from the work order screen using the Print PDF action.

  • A. Work Order Traveler
  • B. Bill of material
  • C. Resource List
  • D. Print Labels
  • E. Print Component List

Answer: A,D,E

 

NEW QUESTION 37
Your Customer has implemented Oracle Cloud Manufacturing and the Manufacturing user is in the process of defining Work Definition and Operations. However, this user is unable to assign an ad hoc item, Grease, to an operation.
Identify the reason.

  • A. The user doesn't have Override Item Structure Components in the Work Definition privileges.
  • B. The user doesn't have Data access to create item structure.
  • C. The user doesn't have access to the PIM module.
  • D. An itemcannot be assigned on an ad hoc basis.

Answer: D

 

NEW QUESTION 38
A Production Supervisor queries a Work Order (WO-1025) from the manage Work Orders page. On the Entering Edit Work Order: WO-1025 page, he finds General Information, Operations and History tab, but not the Reservations tab.
Identify the two reasons that can cause the Reservations tab not to be displayed.

  • A. Work Order (WO-1025) is not a Drop-ShipWork Order.
  • B. Work Order (WO-1025) is not a Plan-to-produce Work Order.
  • C. Work Order (WO-1025) is not a Configured item Work Order.
  • D. Work Order (WO-1025) is not a Pick-to-order Work Order.
  • E. Work Order (WO-1025) is not a Back-to-Back Work Order.

Answer: A,C

 

NEW QUESTION 39
Your customer plans to use Oracle Representational State Transfer (REST) API with Oracle Supply Chain Management Cloud (Oracle SCM Cloud) to support integration requirements.
Identify four REST resources and thecorresponding HTTP action available with Manufacturing Cloud.

  • A. Work Orders GET method
  • B. Resource transaction POST method
  • C. Resource transaction GET method
  • D. Work Order Status GET method
  • E. Work Order Status POST method
  • F. Work Orders PATCH method

Answer: A,B,D,F

 

NEW QUESTION 40
Identify the three sources from which supply chain orchestration (SCO) can create the work orders.

  • A. Order Management
  • B. Planning
  • C. Inventory Min-Max Planning
  • D. Procurement
  • E. Quality

Answer: A,B,D

 

NEW QUESTION 41
During a Manufacturing Cloud implementation, the customer request to develop Oracle Transactional Business Intelligence reports that are not available out-of- the box.
Identify the tool that is available to the Report Developer in Manufacturing Cloud to develop the reports.

  • A. Oracle Business Intelligence Enterprise Edition
  • B. Oracle Business Intelligence Standard Edition
  • C. Oracle Business Intelligence Publisher
  • D. Oracle Business Intelligence Application

Answer: C

 